Management
Project team is a broad term. In general, it encompasses all the people and organizations working on the project�architect, engineer, consultants, client, client's consultants,...

Project Quality
Quality means that you must listen to the client. You are not the last word, especially when it comes to the budget, the design fee, and the parameters of the project on which you are...

Managing Projects for Profit
The section on Project Quality described the necessary steps that must be taken to ensure quality. Namely, ensuring that the project be completed within budget, on time, and that it meet...

Turning Water into Dollars
Revenues were suffering in the water departments of Jefferson Parish, La. and Houston in the late 1980s and early 90s. But after overhauling their billing, collection and customer-service...

Wider Ride to the Rainbow
Engineers on the project to widen the entrance to the Rainbow Bridge between New York and Ontario let the aesthetics of the Niagara Falls setting dictate their design decisions. The challenge...

Project Management: One Step Beyond
Good project managers are made, not born. But those with a special dedication to a project look beyond the most basic measures of success toward building constructive relationships within...

Designing for the First Flush
This article explains some of the details involved in separating the first flush of a storm event from the remainder of the storm. It also explains how to provide primary treatment of...

Do Civil Engineers Have an Ethical Responsibility to their Client at the Expense of the Environment?
The application of engineering ethics to the environment is at the center of the debate regarding sustainable development. If the environment is to be held above client needs, say many,...

The Effects of Spatial Resolution in Modeling the North Fork Drainage of the Gunnison River Basin
The U.S. Geological Survey Precipitation-Runoff Modeling System (PRMS) is a modular, distributed-parameter, watershed modeling system developed for use in evaluating the effects of climate...

Parameter Regionalization of a Daily Baseflow Runoff Model
Daily baseflow values are required to characterize the environmental measurements being carried out in several basins in the Province of Genova, northern Italy. The main purpose of these...

Evaluation of the Return Period of the September 1992 Flood in Genova, Italy
The September 1992 flood in Genova caused great damage and loss of life. The flood peak, at the outlet of a 12.5 km2 basin, was estimated at 200...

Dry Weather Stormwater Management - Yakima, WA
The city of Yakima recently completed a Comprehensive Stromwater Management plan to: 1) assess current and projected local runoff quality and 2) develop strategies to improve receiving...

Joint Probability Distribution of Rainfall Intensity and Duration
Intensity-duration-frequency (IDF) curves are widely used for peak discharge estimation in designing hydraulic structures. Accurate interpolated and extrapolated intensity values are difficult...

Hydraulic Properties of Surface Runoff on Ash-Mixed Concrete Pavement
The disposal of incinerated sludge ash from wastewater treatment plants is becoming an increasingly difficult problem in highly populated cities. The feasibility of reusing sludge ash...

Mitigation of Non-Point Source Pollution Impacts on Groundwater Aquifers: A Case Study
This paper presents methodologies applied to a regional-scale project to study the potential impacts of storm runoff on groundwater aquifers that store sole source water supplies in Morris...

Joint Pond-Wetland System Performance in Colorado
The Shop Creek retention pond and follow-up wetlands were constructed in 1989, by the City of Aurora, Colorado, and the Cherry Creek Basin Water Quality Authority to enhance urban storm...

Conservation Measures in Urban Storm Water Management
The management of storm water runoff has been given considerable attention by regulatory agencies and practicing engineers in recent years. The current state of-the-art of storm water...

Willingness-to-Pay for Alternative Shortage Probability Distributions
Mathematical programming is used to derive estimates of the willingness-to-pay of water service customers for improvements in water supply reliability. Reliability is represented as a...

The Economic Cost of Stocking Catchable Rainbow Trout
States annually stock about 20 million pounds of catchable trout in public waters. Complete information on cost is essential to help wildlife agencies make operating and planning decisions....

Peak Runoff Prediction for Small Rural Watersheds
A regression model for peak runoff prediction from small rural watersheds was developed using the rainfall/runoff data collected from 43 watersheds in the front range of the State of Colorado....

 

 

 

 

Return to search